This summer was supposed to be a breakout season for the faltering offshore wind business in the U.S. Instead it may be defined by an ill-timed break. 

A large project off the coast of Massachusetts, called Vineyard Wind, remains at a standstill following an accident that dropped a massive turbine blade into the ocean last month and washed chunks of debris onto Nantucket beaches.

The blade broke at the height of summer and at a pivotal moment for the U.S. offshore wind industry, which has struggled with rising costs, political opposition and a wave of canceled and renegotiated contracts. Efforts to launch the sector in the U.S. are considered key to President Biden’s climate aspirations but would be especially vulnerable if former President Donald Trump returns to office.

Read more.

Have you listened to this article via the audio player?

If so, send us your feedback around what we can do to improve this feature or further develop it. If not, check it out and let us know what you think via email or on social media.

The NF Aggregator showcases relevant stories from across the commercial fishing industry. To send us a link for inclusion, get in touch on Linkedin.

Join the Conversation